Project Overview
In 2017, PT Buana Masa Metalindo was entrusted to construct the Palm Kernel Oil (PKO) Mill facility, located in Wajok, West Kalimantan.
Known as Murai Mill, the project was developed on a 6-hectare site and designed to serve as a Kernel Crushing Plant capable of processing up to 400 tonnes of kernel per day.
This facility was engineered with BMM’s reliable and high-efficiency processing system, ensuring smooth operations and consistent kernel output to meet industrial standards.
Project Result
The Murai Mill was completed successfully and has been fully operational since its handover. With optimized plant layout and durable structural design, the facility provides efficient material flow, reduced downtime, and high productivity.
The completion of this project highlights BMM’s capability in delivering turnkey industrial facilities that support sustainable palm kernel oil production in Indonesia.
