Media & Publications
Project
Double Girder Structure
Design and installation of a Double Girder Overhead Crane structure with a maximum lifting capacity of 85 tonnes and a span of 18 meters.
November 13, 2025
Project
Double Girder Structure
Fabrication and installation of a double girder overhead crane with a maximum capacity of 4 tonnes and a span length of 34.1 meters.
November 13, 2025
Project
Construction of CPO Plant Facilities located in Batu Ampar, West Kalimantan
Construction of a CPO Mill facility using a Self Discharge Vertical Sterilizer system with a capacity of 40 tons per hour, located in Batu Ampar, West Kalimantan.
November 13, 2025
Project
Construction of CPO Plant Facilities located in Wajok, West Kalimantan
Construction of a CPO Mill facility in Wajok, West Kalimantan, featuring BMM’s Self Discharge Vertical Sterilizer system with a processing capacity of 30 tons per hour (TPH).
November 13, 2025
Project
Construction of a Palm Kernel Oil (PKO) Plant with a Capacity of 400 TPD in West Kalimantan
Construction of a Palm Kernel Oil (PKO) Mill facility in West Kalimantan with a processing capacity of 400 tonnes per day, utilizing BMM’s efficient kernel crushing system.
November 12, 2025
Project
Construction of CPO Plant Facilities located in Sintang, West Kalimantan
Construction of a CPO Mill facility in Sintang, West Kalimantan, equipped with BMM’s Self Discharge Vertical Sterilizer system with a capacity of 45 tons per hour (TPH).
November 12, 2025
Project
Gantry Crane
Design and installation of a gantry crane with a maximum lifting capacity of 80 tonnes and a span length of 33 meters.
November 12, 2025






