Media & Publications

Project

Double Girder Structure

Design and installation of a Double Girder Overhead Crane structure with a maximum lifting capacity of 85 tonnes and a span of 18 meters.

November 13, 2025

Project

Double Girder Structure

Fabrication and installation of a double girder overhead crane with a maximum capacity of 4 tonnes and a span length of 34.1 meters.

November 13, 2025

Project

Construction of CPO Plant Facilities located in Batu Ampar, West Kalimantan

Construction of a CPO Mill facility using a Self Discharge Vertical Sterilizer system with a capacity of 40 tons per hour, located in Batu Ampar, West Kalimantan.

November 13, 2025

Project

Construction of CPO Plant Facilities located in Wajok, West Kalimantan

Construction of a CPO Mill facility in Wajok, West Kalimantan, featuring BMM’s Self Discharge Vertical Sterilizer system with a processing capacity of 30 tons per hour (TPH).

November 13, 2025

Project

Construction of a Palm Kernel Oil (PKO) Plant with a Capacity of 400 TPD in West Kalimantan

Construction of a Palm Kernel Oil (PKO) Mill facility in West Kalimantan with a processing capacity of 400 tonnes per day, utilizing BMM’s efficient kernel crushing system.

November 12, 2025

Project

Construction of CPO Plant Facilities located in Sintang, West Kalimantan

Construction of a CPO Mill facility in Sintang, West Kalimantan, equipped with BMM’s Self Discharge Vertical Sterilizer system with a capacity of 45 tons per hour (TPH).

November 12, 2025

Project

Gantry Crane

Design and installation of a gantry crane with a maximum lifting capacity of 80 tonnes and a span length of 33 meters.

November 12, 2025